What constitutes grading excavation?

Spread the love

When a new housing subdivision is being planned, the roads and the building lots are carefully planned out when it comes to elevation and slope. When the land is first purchased by the developer it is often far different than what the plans call for and as such Ottawa excavation is brought in to level the land where the roads will be located and the homes will be sited, this manipulation of the land profile is done primarily for erosion control and overall project design.

When a construction company is tasked with building roads, special design techniques are used. Surveyors are first called in to prepare the grade using levels, level rods and transits. Stakes are driven periodically which indicate the amount of soil to be either removed or added to accomplish the design grades. Once this process has been completed, the heavy equipment operators can begin their task of moving soil.

Not everyone can run a grader or bulldozer; it requires an operator with experience and skill in carving the land to design. The equipment, be it a bulldozer or grader is equipped with a blade that allows the operator to literally shave the land to accommodate the measurements earlier set by the survey team.

The machines that are used are all considered as heavy equipment and the operator must have had special training to do this work. Not everyone has the skill that is necessary to complete an excavation in Ottawa that provides the proper grades and slopes which are used for water runoff and for the installation of sewers.

To build a road and to grade for homes requires that engineers first develop a plan that accommodates all the needs of the subdivision, remember, water and sewage only run downhill so constant attention to the grades is mandatory. The process begins with stripping of the overburden which includes removal of trees and shrubs that are in the way. Once this has been accomplished and the debris properly deposited, the business of cutting the road can begin. The road is cut so that it not only follows the correct grade, it will accommodate future deposits of gravel and surfacing material, either concrete or asphalt. When the road works is completed, the developer can be assured that flooding will not be a problem to any of the new property owners.